GeoPentech completed the seismic evaluation of Berth 147 project for the Port of Los Angeles, which involved liquefaction assessment and soil-structure interaction analysis. The evaluation was conducted to optimize the thickness of quarry run used on the face of the slope supporting the deck without excessively increasing seismically induced deformation of under the postulated earthquake shaking.