GeoPentech has provided geotechnical and earthquake engineering services for the preliminary design of the Second Narrows Water Supply Tunnel crossing Burrard inlet near Vancouver, British Columbia. The new crossing is planned to withstand the Maximum Credible Earthquake and remain operational with a return period of 10,000 years.