GeoPentech provided geotechnical engineering consulting services during the design and construction of the dam and the reservoir., which is an emergency water storage facility that includes a 155-ft high and 1000-ft long earth fill embankment dam, liner, floating cover, spillway, inlet/outlet pipeline and the associated ancillary facilities. The construction of the reservoir was completed in 2009.